1. Goal of the Project:

The main goal of the project is to increase power supply in the country by designing, supplying, installation and commissioning a 10MW Solar PV Power Plant, Auxiliary Equipment and Associated Works at Nanjoka in Salima. EGENCO plans to install the solar PV plant close to a growing load center (Salima) to maximize benefits to the national grid and satisfy the afternoon peak demand. EGENCO has already secured enough land for future scaling up of the plant by another 10MW.

2. Project Description:

The project scope entails detailed feasibility study, designing, supplying, installing and commissioning of a 10MW Solar PV Power Plant, Auxiliary Equipment and Associated Works at Nanjoka in Salima. The generated electricity will be connected to the national grid at the existing Nanjoka Substation in Salima. The project will be designed for implementation in two phases of 10MW each.

a) Scope: The project involves installation of a 20MW solar PV plant.

b) Project Impact: The project will increase the generation capacity and introduce a diverse power mix in the generation system.